VTW Vermessungstechnik West
  • Engineering Surveying
  • 3D laser scanning
  • Technical documentation
  • Engineering Surveying
  • Surveying during construction
  • crack images patterns
  • Measuring concepts
  • Panoramic photography
  • Preservation of evidence
  • Construction Surveying
  • Laserscanning
  • Monitoring
  • Engineering Surveying
  • industrial surveying
  • 3D laser scanning
  • 3D laser scanning
  • 3D laser scanning
  • 3D laser scanning
  • 3D laser scanning
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Completed Projects Contact

Call us at
+49 (0) 201 38 44 89 -0

3D Laser Scanning
Digital Terrain Model
3D Modelling
Deformation Measurement
Preservation of evidence
Mining Surveying
Quantity Computation
Echo Sounding
Pipe Documentation
Construction Surveying
Duct Surveying

On this page we provide a selection of our completed projects.

  • Refinery - Shell - 10/2012
    Survey of pipes on trestles using non-contact 3D laser measurement technology for the static calculation of struts and suspensions.
  • Construction project Depot Essen/Limbecker Platz - 08/2012
    Measurement of a structural work for future sales rooms over several floors for planning purposes using 3D laser scanning - Gödicker GmbH
  • Lanxess/Dormagen - 06/2012
    Measurement of interfering edges using 3D laser scanning, modelling, collision detection
  • Finnentrop - Thyssen Krupp Steel AG - 06/2012
    Laser scanning of a welding machine and 3D modelling with subsequent collision detection of soon to be built system components
  • Refinery in Romania - 10/2011
    Determining the ovality of a tank using 3D laser scanning - object scanning
  • Paper factory M.J. Weig Mayen - 08-10/2011
    Laser scan of a system over two levels. Modelling steel works, NetView project for planning purposes, collision detection

    collision detection collision detection NetView
    Click on the photo to zoom in.

  • Renovation of the Theatre Schauspielhaus Düsseldorf - 07/2011
    3D laser scanning as planning basis

    Renovation of the Theatre Schauspielhaus Düsseldorf Renovation of the Theatre Schauspielhaus Düsseldorf Renovation of the Theatre Schauspielhaus Düsseldorf

  • Former worsted yarn spinning mill in Essen-Kettwig - 07/2011
    large-scale interior measurement with detailed survey of all building-relevant elements using 3D laser scanning in order to plan reconstruction works
  • Flywheel of a hydrogen compressor - 03/2011
    High-precision determination of the inside radius using a tactile Romer arm in cooperation with the Conap GmbH Aachen.
  • Church Namen Jesu in Bonn - 02/2011
    Recording of roof truss by means of 3D laser scanning as basis for static calculations for monumental protection.

    Namen Jesu Kirche Bonn Namen Jesu Kirche Bonn Namen Jesu Kirche Bonn Namen Jesu Kirche Bonn Namen Jesu Kirche Bonn
    Click on the photo to zoom in.

  • Cologne Trade Fair - 06-07/2010 and 10-11/2010
    3D laser scan, documentation of the hall ceilings as planning basis for exhibition construction.
  • Church Leonardskirche in Frankfurt
    3D laser scanning close-up, documentation for the restoration of the baroque architectural style.
  • Power plant Ibbenbüren
    3D laser scanning and 3D modelling with collision detection for the replacement of condensers.


    Panoramic photo: Machine hall at the Ibbenbüren power plant (use mouse to navigate the photo)

  • Motorway A40 - Stillleben Ruhr.2010
    Route surveying via GPS as planning basis. Defining main route points in cooperation with the THW (German Federal Agency for Technical Relief) and police.
  • Route surveying via GPS Route surveying via GPS Route surveying via GPS Route surveying via GPS Route surveying via GPS
    Click on the photo to zoom in.

  • Petrochemical plant
    Survey by means of laser scanning, collision detection with planned pipe systems.
  • Underground parking/subway station below the Römer guildhall in Frankfurt/M.
    Survey (3D laser scanning) and 3D modelling of the underground parking/ subway station levels C/D in the course of the scheduled demolition of the technical guildhall in Frankfurt/M.
    » interactive PDF  [operation instructions]
  • RWE Power AG, power plant Biblis
    Planning and surveying a 3D reference point network over 6 levels in order to create a site map.
  • Deformation measurements on a trestle (or container) in order to measure the deviation from the required geometrical design form.
  • Preservation of evidenceen Preservation of evidenceen Preservation of evidenceen Preservation of evidenceen Preservation of evidenceen
    Click on the photo to zoom in.

  • Damietta, Egypt - 2006
    Control surveys for the construction of a new fertiliser complex for the Uhde GmbH Dortmund
  • Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt Control surveys for the construction of a new fertiliser complex, Damietta, Egypt
    Click on the photo to zoom in.

  • Cologne Cathedral (south tower) Surveying during the construction of tunnel excavation works through the foundation of the cathedral   » Press
  • Shell Deutschland Oil GmbH
    Detailaufnahme von pipe bridges , deren Belegung zu Planungszwecken, Dokumentation in Detailplänen
  • Cologne Cathedral
    Periodische Preservation of evidenceen
  • Gypsum mining ENGEL GmbH Trier/Quarzwerke Witterschlick GmbH & Co.KG
    Mine surveying calculations above and below ground for the assessment of the output situation
  • Shell Deutschland Oil GmbH
    Surveying during the construction of a new spare chimney
  • LWL-Ringtrasse Düsseldorf
    Aufmass am offenen Graben,
    Measurement at the open ditch, determination of property boundaries and route documentation for Level3 (length: 35km)
  • Sasol Solvents GmbH plant Moers
    Survey for an update of the plant site plans

© 2017 VTW

Phone +49 (0) 201 38 44 89 -0   |   Fax +49 (0) 201 38 44 89 -29   |   info@vtw-gmbh.de   |   www.vtw-gmbh.deAbout us   |   Privacy policy   |   Sitemap